From the Canyon Edge -- :-Dustin

Thursday, July 30, 2009

Solar Installation - Part 1

So Step 1 in our solar project was upgrading the electrical panel. All of my breakers were spoken for, so I had to add a line side distribution box for the solar to interconnect. The junction box at the bottom allows me to add a sub-panel into my main distribution panel. The PV system will connect into this dedicated sub-panel.

Thanks to Joseph of Jackpot Electric for the nice, clean installation!

For other articles in this series, see: